Water Resources
for today and the future

Services

Computational Fluid Dynamics
CFD Modelling

Services

1
1

Water Resources

Our water resources services for project developers, government agencies & engineering companies

Water Resources Research, Monitoring & Management

Fish Biomass
Fish Size Structure
Fish Abundance
Fish Behavior
Fish Distribution
Fish Swimming Ability
Fish Stock Assessment
Fish Species Composition
River Habitat Classification
River Bottom & Vegetation Classification
Environmental Flow Assessment
Water Quality Assessment
Bathymetric Surveys
Current Profiling
Discharge Measurement

Environmental Impact Assessment

Environmental Compensation & Mitigation Measures

Feasibility Studies
Computational Fluid Dynamics (CFD) Modelling
Physical Hydraulic Modelling
Design Criteria
Design
Monitoring

Computational Fluid Dynamics (CFD) Modelling

Multiphase free surface flow modelling
3-dimensional CFD modelling
Numerical analysis
3-dimensional visualizations

Xayaburi HPP – Detailed civil design of the fish passage facilities. Xayaburi Hydropower Project, Lao PDR

Xayaburi HPP – Detailed civil design of the fish passage facilities. Xayaburi Hydropower Project, Lao PDR

Xayaburi HPP – Baseline Study on Mekong Fish & Fisheries, Mekong River. Xayaburi Hydropower Project, Lao PDR

Xayaburi HPP – Baseline Study on Mekong Fish & Fisheries, Mekong River. Xayaburi Hydropower Project, Lao PDR

Xayaburi HPP – Fish Swimming Ability Study, Mekong River. Xayaburi Hydropower Project, Lao PDR

Xayaburi HPP – Fish Swimming Ability Study, Mekong River. Xayaburi Hydropower Project, Lao PDR

Xayaburi HPP – Fish Biomass and Migration Study, Mekong River. Xayaburi Hydropower Project, Lao PDR

Xayaburi HPP – Fish Biomass and Migration Study, Mekong River. Xayaburi Hydropower Project, Lao PDR

Xayaburi HPP – Updating of the Outline Design of the Navigation Lock for Fish Passage. Xayaburi Hydropower Project, Lao PDR

Xayaburi HPP – Updating of the Outline Design of the Navigation Lock for Fish Passage. Xayaburi Hydropower Project, Lao PDR

Xayaburi HPP – Navigation Lock Updated Design Criteria for Fish Passage and Design Report. Xayaburi Hydropower Project, Lao PDR

Xayaburi HPP – Navigation Lock Updated Design Criteria for Fish Passage and Design Report. Xayaburi Hydropower Project, Lao PDR

Xayaburi HPP – Tender (basic) design for the fish passage facilities. Xayaburi Hydropower Project, Lao PDR

Xayaburi HPP – Tender (basic) design for the fish passage facilities. Xayaburi Hydropower Project, Lao PDR

Xayaburi HPP – Feasibility study for the fish passage facilities. Xayaburi Hydropower Project, Lao PDR

Xayaburi HPP – Feasibility study for the fish passage facilities. Xayaburi Hydropower Project, Lao PDR

Fish passage principles to be considered for medium and large dams on the Mekong mainstem in Laos. Journal Publication

Fish passage principles to be considered for medium and large dams on the Mekong mainstem in Laos. Journal Publication

Applicability of a rough-channel pool pass for fish passage. Hydroelectric Power Project.

Applicability of a rough-channel pool pass for fish passage. Hydroelectric Power Project.

Alternative study for fish monitoring facilities. Hydroelectric Power Project.

Alternative study for fish monitoring facilities. Hydroelectric Power Project.

Alternative study for the implementation of fish trapping facilities. Hydroelectric Power Project.

Alternative study for the implementation of fish trapping facilities. Hydroelectric Power Project.

Biological baseline studies. River and wetland restoration project, Switzerland

Biological baseline studies. River and wetland restoration project, Switzerland

Feasibility study. Production of organic coffee, Republic of Costa Rica

Feasibility study. Production of organic coffee, Republic of Costa Rica

Consultancy services for the application of organic fertilizers in arid and semi-arid climate zones, Hashemite Kingdom of Jordan.

Consultancy services for the application of organic fertilizers in arid and semi-arid climate zones, Hashemite Kingdom of Jordan.